We undertook erosion control works, access management and revegetation at Crinolin Pt, Coffin Bay. 

Erosion control works included the use of geotextile fabric to allow soil capture and stabilization to allow revegetation with seed and tubestock of local native plant species.  Direct seeding was undertaken with the use of polymers which were sprayed on to stabilise soil to allow a stable substrate for seedling germination.  This was the first time that we had used this method.

 Vehicle tracks were revegetated to protect the fragile clifftop and beach and to provide better pedestrian access.